Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

3 for 1 - Opening (#70)

Check satisfaction with iteration results, communication & mood all at once
Source: Judith Andresen
Prepare a flip chart with a co-ordinate plane on it. The Y-axis is 'Satisfaction with iteration result'. The X-axis is 'Number of times we coordinated'. Ask each participant to mark where their satisfaction and perceived touch points intersect - with an emoticon showing their mood (not just a dot).Discuss surprising variances and extreme moods.
(Vary the X-axis to reflect current team topics, e.g. 'Number of times we pair programmed'.)

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Park Bench (#41)

Group discussion with varying subsets of participants
Source: Diana Larsen
Place at least 4 and at most 6 chairs in a row so that they face the group. Explain the rules:
  • Take a bench seat when you want to contribute to the discussion
  • One seat must always be empty
  • When the last seat is taken, someone else must leave and return to the audience
Get everything going by sitting on the 'bench' and wondering aloud about something you learned in the previous phase until someone joins. End the activity when discussion dies down.
This is a variant of 'Fish Bowl'. It's suited for groups of 10-25 people.

Landscape Diagram (#100)

Assess action items based on how clear they are and take your pick
Source: Diana Larsen adapted it from Human Systems Dynamics Institute
This activity is helpful when a team is facing an ambiguous, volatile, uncertain or complex set of problems and has many suggested action items to choose from.

Draw a Landscape Diagram, i.e. an x-axis labeled 'Certainty about approach' and a y-axis labeled 'Agreement on issue'. Both go from low certainty / agreement in their mutual origin to high towards the top / right. For each action item ask 'How much agreement do we have that solving this problem would have a great beneficial impact? How certain are we about the first steps toward a solution?' Place the note on the diagram accordingly.
When all actions are placed, shortly discuss the 'map' you created. Which actions will give the greatest benefit in the next iteration? Which are more long term?

Choose 2 actions from the simple / ordered area of the map or 1 action from the complex area.

Feedback Door - Smilies (#23)

Gauge participants' satisfaction with the retro in minimum time using smilies
Source: Boeffi
Draw a ':)', ':|', and ':(' on a sheet of paper and tape it against the door. When ending the retrospective, ask your participants to mark their satisfaction with the session with an 'x' below the applicable smily.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.