Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Emoticon Project Gauge (#32)

Help team members express their feelings about a project and address root causes early
Source: Andrew Ciccarelli
Prepare a flipchart with faces expressing various emotions such as:
  • shocked / surprised
  • nervous / stressed
  • unempowered / constrained
  • confused
  • happy
  • mad
  • overwhelmed
Let each team member choose how they feel about the project. This is a fun and effective way to surface problems early. You can address them in the subsequent phases.

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Park Bench (#41)

Group discussion with varying subsets of participants
Source: Diana Larsen
Place at least 4 and at most 6 chairs in a row so that they face the group. Explain the rules:
  • Take a bench seat when you want to contribute to the discussion
  • One seat must always be empty
  • When the last seat is taken, someone else must leave and return to the audience
Get everything going by sitting on the 'bench' and wondering aloud about something you learned in the previous phase until someone joins. End the activity when discussion dies down.
This is a variant of 'Fish Bowl'. It's suited for groups of 10-25 people.

Maximize Follow Through (#117)

Think about how the team will follow up and set yourselves up for success
Source: Chris Rimmer
Prepare a flip chart with 4 columns titled 'Action', 'Motivation', 'Ease' and 'Reminder'. Write down the list of actions the team wants to take in the first column. Read out each action and fill in the other columns by asking:
  • Motivation - How can we motivate ourselves to do this?
    Examples: 'Jane will own this and report back at the next retrospective', or 'We'll reward ourselves with cake on Friday if we do this every day'

  • Ease - How can we make it easy to do?
    Example: For an action 'Start involving Simon in the stand up' a possibility could be 'Move the task board next to Simon's desk'

  • Reminder - How will we remember to do this?
    Examples: 'Richard will put a reminder in Google Calendar' or 'We'll do this after the stand up each day'
Actions do not require all of the above. But if there are no suggestions for any of the columns, ask the team if they really think they will do it.

Feedback Door - Smilies (#23)

Gauge participants' satisfaction with the retro in minimum time using smilies
Source: Boeffi
Draw a ':)', ':|', and ':(' on a sheet of paper and tape it against the door. When ending the retrospective, ask your participants to mark their satisfaction with the session with an 'x' below the applicable smily.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.