Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Greetings from the Iteration (#85)

Each team member writes a postcard about the last iteration
Source: Filipe Albero Pomar
Remind the team what a postcard looks like:
  • An image on the front,
  • a message on one half of the back,
  • the address and stamp on the other half.
Distribute blank index cards and tell the team they have 10 minutes to write a postcard to a person the whole team knows (i.e. an ex-colleague). When the time is up, collect and shuffle the cards before re-distributing them. Team members take turns to read out loud the postcards they got.

Lines of Communication (#86)

Visualize how information flows in, out and around the team
Source: Tarmo Aidantausta
Is information not flowing as well as it needs to? Do you suspect bottlenecks? Visualize the ways information flows to find starting points for improvements. If you want to look at one specific flow (e.g. product requirements, impediments, ...) check out Value Stream Mapping (#79). For messier situations try something akin to Cause-Effect-Diagrams (#25).
Look at the finished drawing. Where are delays or dead ends?

Snow Mountain (#118)

Address problematic burndowns and scope creep
Source: Olivier Fortier
This activity is helpful when a team is constantly dealing with additional requests and scope creep. Use the burndown chart of problematic sprints to draw snowy mountains with the same outline. Add a few trees here and there. Print drawings of kids in various sledging situations such as kid sledging down fast, kid sledging and being scared, kid with a sledge looking bored, etc. (You can use Google image search with 'kid sledging drawing').

In teams of 2 or 3, ask the team members to identify which kid's reaction goes with which part of the mountain.
Example: If the mountain is flat, the kid might be bored. If you're facing a wall, the kid might be scared.

You can then discuss the team's reaction facing their own burndowns.

Dot Voting - Worked well, Do differently (#39)

Brainstorm what worked well & what to do differently and pick the top initiatives
Source: Agile Retrospectives
Head 2 flip charts with 'Worked well' and 'Do differently next time' respectively. Ask your participants to write concrete proposals for each category - 1 idea per index card. Let them write in silence for a few minutes. Let everyone read out their notes and post them to the appropriate category. Lead a short discussion on what the top 20% beneficial ideas are. Vote on it by distributing dots or X's with a marker, e.g. 1, 2, and 3 dots for each person to distribute. The top 2 or 3 become your action items.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.