Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Greetings from the Iteration (#85)

Each team member writes a postcard about the last iteration
Source: Filipe Albero Pomar
Remind the team what a postcard looks like:
  • An image on the front,
  • a message on one half of the back,
  • the address and stamp on the other half.
Distribute blank index cards and tell the team they have 10 minutes to write a postcard to a person the whole team knows (i.e. an ex-colleague). When the time is up, collect and shuffle the cards before re-distributing them. Team members take turns to read out loud the postcards they got.

Expectations (#62)

What can others expect of you? What can you expect of them?
Source: Valerie Santillo
Give each team member a piece of paper. The lower half is blank. The top half is divided into two sections:
  • What my team mates can expect from me
  • What I expect from my team mates
Each person fills out the top half for themselves. When everyone is finished, they pass their paper to the left and start reviewing the sheet that was passed to them. In the lower half they write what they personally expect from that person, sign it and pass it on.
When the papers made it around the room, take some time to review and share observations.

Company Map (#68)

Draw a map of the company as if it was a country
Source: Judith Andresen
Hand out pens and paper. Pose the question 'What if the company / department / team was territory? What would a map for it look like? What hints would you add for save travelling?' Let participants draw for 5-10 minutes. Hang up the drawings. Walk through each one to clarify and discuss interesting metaphors.

SMART Goals (#13)

Formulate a specific and measurable plan of action
Source: Agile Retrospectives
Introduce SMART goals (specific, measurable, attainable, relevant, timely) and examples for SMART vs not so smart goals, e.g.'We'll study stories before pulling them by talking about them with the product owner each Wednesday at 9am' vs. 'We'll get to know the stories before they are in our sprint backlog'.
Form groups around the issues the team wants to work on. Each group identifies 1-5 concrete steps to reach the goal. Let each group present their results. All participants should agree on the 'SMART-ness' of the goals. Refine and confirm.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.