Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Last Retro's Actions Table (#84)

Assess how to continue with last retro's actions
Source: Sven Winkler
Create a table with 5 columns. The first column lists last retro's action items. The other columns are headed 'More of', 'Keep doing', 'Less of' and 'Stop doing'. Participants place 1 sticky note per row into the column that states how they want to proceed with that action. Afterwards facilitate a short discussion for each action, e.g. asking:
  • Why should we stop doing this?
  • Why is it worth to go further?
  • Are our expectations satisfied?
  • Why do opinions vary that much?

Lines of Communication (#86)

Visualize how information flows in, out and around the team
Source: Tarmo Aidantausta
Is information not flowing as well as it needs to? Do you suspect bottlenecks? Visualize the ways information flows to find starting points for improvements. If you want to look at one specific flow (e.g. product requirements, impediments, ...) check out Value Stream Mapping (#79). For messier situations try something akin to Cause-Effect-Diagrams (#25).
Look at the finished drawing. Where are delays or dead ends?

Learning Matrix (#9)

Team members brainstorm in 4 categories to quickly list issues
Source: Agile Retrospectives
After discussing the data from Phase 2 show a flip chart with 4 quadrants labeled ':)', ':(', 'Idea!', and 'Appreciation'. Hand out sticky notes.
  • The team members can add their input to any quadrant. One thought per sticky note.
  • Cluster the notes.
  • Hand out 6-10 dots for people to vote on the most important issues.
This list is your input for Phase 4.

Open Items List (#24)

Participants propose and sign up for actions
Source: Corinna Baldauf, inspired by this list
Prepare a flip chart with 3 columns titled 'What', 'Who', and 'Due'. Ask one participant after the other, what they want to do to advance the team. Write down the task, agree on a 'done by'-date and let them sign their name.
If someone suggests an action for the whole team, the proposer needs to get buy-in (and signatures) from the others.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.