Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Three Words (#82)

Everybody sums up the last iteration in 3 words
Source: Yurii Liholat
Ask everyone to describe the last iteration with just 3 words. Give them a minute to come up with something, then go around the team. This helps people recall the last iteration so that they have some ground to start from.

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Poster Session (#91)

Split a large group into smaller ones that create posters
Source: Unknown, adapted by Corinna Baldauf, inspired by Michal Grzeskowiak
After you've identified an important topic in the previous phase you can now go into detail. Have the larger group split up into groups of 2-4 people that will each prepare a poster (flip chart) to present to the other groups. If you have identified more than one main topic, let the team members select on which they want to work further.
Give the teams guidelines about what the posters should cover / answer, such as:
  • What exactly happens? Why is that a problem?
  • Why / when / how does this situation happen?
  • Who benefits from the current situation? What is the benefit?
  • Possible solutions (with Pros and Cons)
  • Who could help change the situation?
  • ... whatever is appropriate in your setting ...
The groups have 15-20 minutes to discuss and create their posters. Afterwards gather and each group gets 2 minutes to present their results.

Outside In (#124)

Turn blaming others into actions owned by the team
Source: Ralph Miarka and Veronika Kotrba
If your team has a tendency to see obstacles outside of their team and influence and primarily wants others to change, you can try this activity:

Draw a big rectangle on the board and another rectangle inside of it, like a picture frame. Hang all complaints and grievances that surfaced in previous phases into the frame.

Now comes the interesting twist: Explain that if they want anything in the outside frame to change, they will have to do something themselves to affect that change. Ask the team to come up with actions they can do. Put these actions into the inner rectangle (near the outer sticky they are addressing).

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.