Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Outcome Expectations (#81)

Everyone states what they want out of the retrospective
Source: Inspired by Jim & Michele McCarthy
Everyone in the team states their goal for the retrospective, i.e. what they want out of the meeting. Examples of what participants might say:
  • I'm happy if we get 1 good action item
  • I want to talk about our argument about unit tests and agree on how we'll do it in the future
  • I'll consider this retro a success, if we come up with a plan to tidy up $obscureModule
[You can check if these goals were met if you close with activity #14.]

[The Meet - Core Protocol, which inspired this activity, also describes 'Alignment Checks': Whenever someone thinks the retrospective is not meeting people's needs they can ask for an Alignment Check. Then everyone says a number from 0 to 10 which reflects how much they are getting what they want. The person with the lowest number takes over to get nearer to what they want.]

Expectations (#62)

What can others expect of you? What can you expect of them?
Source: Valerie Santillo
Give each team member a piece of paper. The lower half is blank. The top half is divided into two sections:
  • What my team mates can expect from me
  • What I expect from my team mates
Each person fills out the top half for themselves. When everyone is finished, they pass their paper to the left and start reviewing the sheet that was passed to them. In the lower half they write what they personally expect from that person, sign it and pass it on.
When the papers made it around the room, take some time to review and share observations.

5 Whys (#8)

Drill down to the root cause of problems by repeatedly asking 'Why?'
Source: Agile Retrospectives
Divide the participants into small groups (<= 4 people) and give each group one of the top identified issues. Instructions for the group:
  • One person asks the others 'Why did that happen?' repeatedly to find the root cause or a chain of events
  • Record the root causes (often the answer to the 5th 'Why?')
Let the groups share their findings.

Circles & Soup / Circle of Influence (#29)

Create actions based on how much control the team has to carry them out
Source: Diana Larsen who adapted it from 'Seven Habits of Highly Effective People' by Stephen Covey and 'Circle of Influence and Concern' by Jim Bullock
Prepare a flip chart with 3 concentric circles, each big enough to put stickies in. Label them 'Team controls - Direct action', 'Team influences - Persuasive/recommending action' and 'The soup - Response action', from innermost to outermost circle respectively. ('The soup' denotes the wider system the team is embedded into.) Take your insights from the last phase and put them in the appropriate circle.
The participants write down possible actions in pairs of two. Encourage them to concentrate on issues in their circle of influence. The pairs post their action plans next to the respective issue and read it out loud. Agree on which plans to try (via discussion, majority vote, dot voting, ...)

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.