Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Outcome Expectations (#81)

Everyone states what they want out of the retrospective
Source: Inspired by Jim & Michele McCarthy
Everyone in the team states their goal for the retrospective, i.e. what they want out of the meeting. Examples of what participants might say:
  • I'm happy if we get 1 good action item
  • I want to talk about our argument about unit tests and agree on how we'll do it in the future
  • I'll consider this retro a success, if we come up with a plan to tidy up $obscureModule
[You can check if these goals were met if you close with activity #14.]

[The Meet - Core Protocol, which inspired this activity, also describes 'Alignment Checks': Whenever someone thinks the retrospective is not meeting people's needs they can ask for an Alignment Check. Then everyone says a number from 0 to 10 which reflects how much they are getting what they want. The person with the lowest number takes over to get nearer to what they want.]

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

If I were you (#95)

What could sub-groups improve when interacting with others?
Source: Thomas Wallet
Identify sub-groups within the participants that interacted during the iteration, e.g. developers/testers, clients/providers, PO/developers, etc. Give participants 3 minutes to silently write down what they think their group did that negatively impacted another group. One person should be part of one group only and write stickies for all groups they don't belong to - 1 sticky per issue.

Then in turn all participants read their stickies and give them to the corresponding group. The affected group rates it from 0 ('It was not a problem') to 5 ('It was a big problem'). Thus you get insights and shared understanding about problems and can select some of them to work on.

SMART Goals (#13)

Formulate a specific and measurable plan of action
Source: Agile Retrospectives
Introduce SMART goals (specific, measurable, attainable, relevant, timely) and examples for SMART vs not so smart goals, e.g.'We'll study stories before pulling them by talking about them with the product owner each Wednesday at 9am' vs. 'We'll get to know the stories before they are in our sprint backlog'.
Form groups around the issues the team wants to work on. Each group identifies 1-5 concrete steps to reach the goal. Let each group present their results. All participants should agree on the 'SMART-ness' of the goals. Refine and confirm.

Appreciations (#15)

Let team members appreciate each other and end positively
Source: Agile Retrospectives who took it from 'The Satir Model: Family Therapy and Beyond'
Start by giving a sincere appreciation of one of the participants. It can be anything they contributed: help to the team or you, a solved problem, ...Then invite others and wait for someone to work up the nerve. Close, when no one has talked for a minute.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.