Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Outcome Expectations (#81)

Everyone states what they want out of the retrospective
Source: Inspired by Jim & Michele McCarthy
Everyone in the team states their goal for the retrospective, i.e. what they want out of the meeting. Examples of what participants might say:
  • I'm happy if we get 1 good action item
  • I want to talk about our argument about unit tests and agree on how we'll do it in the future
  • I'll consider this retro a success, if we come up with a plan to tidy up $obscureModule
[You can check if these goals were met if you close with activity #14.]

[The Meet - Core Protocol, which inspired this activity, also describes 'Alignment Checks': Whenever someone thinks the retrospective is not meeting people's needs they can ask for an Alignment Check. Then everyone says a number from 0 to 10 which reflects how much they are getting what they want. The person with the lowest number takes over to get nearer to what they want.]

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Brainwriting (#66)

Written brainstorming levels the playing field for introverts
Source: Prof. Bernd Rohrbach
Pose a central question, such as 'What actions should we take in the next iteration to improve?'. Hand out paper and pens. Everybody writes down their ideas. After 3 minutes everyone passes their paper to their neighbour and continues to write on the one they've gotten. As soon as they run out of ideas, they can read the ideas that are already on the paper and extend them. Rules: No negative comments and everyone writes their ideas down only once. (If several people write down the same idea, that's okay.)
Pass the papers every 3 minutes until everyone had every paper. Pass one last time. Now everyone reads their paper and picks the top 3 ideas. Collect all top 3's on a flip chart for the next phase.

Circles & Soup / Circle of Influence (#29)

Create actions based on how much control the team has to carry them out
Source: Diana Larsen who adapted it from 'Seven Habits of Highly Effective People' by Stephen Covey and Circle of Influence and Concern' by Jim Bullock
Prepare a flip chart with 3 concentric circles, each big enough to put stickies in. Label them 'Team controls - Direct action', 'Team influences - Persuasive/recommending action' and 'The soup - Response action', from innermost to outermost circle respectively. ('The soup' denotes the wider system the team is embedded into.) Take your insights from the last phase and put them in the appropriate circle.
The participants write down possible actions in pairs of two. Encourage them to concentrate on issues in their circle of influence. The pairs post their action plans next to the respective issue and read it out loud. Agree on which plans to try (via discussion, majority vote, dot voting, ...)

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.