Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Constellation - Opening (#52)

Let the participants affirm or reject statements by moving around
Source: Lyssa Adkins via Luis Goncalves
Place a circle or sphere in the middle of a free space. Let the team gather around it. Explain that the circle is the center of approval: If they agree to a statement they should move towards it, if they don't, they should move as far outwards as their degree of disagreement. Now read out statements, e.g.
  • I feel I can talk openly in this retrospective
  • I am satisfied with the last iteration
  • I am happy with the quality of our code
  • I think our continuous integration process is mature
Watch the constellations unfold. Ask questions about people's observations, such as which constellations were surprising.
This can also be a closing activity (#53).

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Cause-Effect-Diagram (#25)

Find the source of problems whose origins are hard to pinpoint and lead to endless discussion
Source: Henrik Kniberg
Write the problem you want to explore on a sticky note and put it in the middle of a whiteboard. Find out why that is a problem by repeatedly asking 'So what?'. Find out the root causes by repeatedly asking 'Why (does this happen)?' Document your findings by writing more stickies and showing causal relations with arrows. Each sticky can have more than one reason and more than one consequence
Vicious circles are usually good starting points for actions. If you can break their bad influence, you can gain a lot.

Circle of Questions (#11)

Asking and answering go around the team circle - an excellent way to reach consensus
Source: Agile Retrospectives
Everyone sits in a circle. Begin by stating that you'll go round asking questions to find out what you want to do as a group. You start by asking your neighbor the first question, e.g. 'What is the most important thing we should start in the next iteration?' Your neighbor answers and asks her neighbor a related question. Stop when consensus emerges or the time is up. Go around at least once, so that everybody is heard!

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.