Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Take a Stand - Opening (#43)

Participants take a stand, indicating their satisfaction with the iteration
Source: Corinna Baldauf, inspired by Christoph Pater
Create a big scale (i.e. a long line) on the floor with masking tape. Mark one end as 'Great' and the other as 'Bad'. Let participants stand on the scale according to their satisfaction with the last iteration. Ask people what they notice.
Psychologically, taking a stand physically is different from just saying something. It's more 'real'.
You can reuse the scale if you close with activity #44.

Writing the Unspeakable (#75)

Write down what you can never ever say out loud
Source: Unknown, via Vanessa
Do you suspect that unspoken taboos are holding back the team? Consider this silent activity: Stress confidentiality ('What happens in Vegas stays in Vegas') and announce that all notes of this activity will be destroyed in the end. Only afterwards hand out a piece of paper to each participant to write down the biggest unspoken taboo in the company.
When everyone's done, they pass their paper to their left-hand neighbors. The neighbors read and may add comments. Papers are passed on and on until they return to their authors. One last read. Then all pages are ceremoniously shredded or (if you're outside) burned.

Remember the Future (#37)

Imagine the next iteration is perfect. What is it like? What did you do?
Source: Luke Hohmann
'Imagine you could time travel to the end of the next iteration (or release). You learn that it was the best, most productive iteration yet! How do your future selves describe it? What do you see and hear?' Give the team a little time to imagine this state and jot down some keywords to aid their memory. Then let everyone describe their vision of a perfect iteration.
Follow up with 'What changes did we implement that resulted in such a productive and satisfying future?'Write down the answers on index cards to use in the next phase.

Outside In (#124)

Turn blaming others into actions owned by the team
Source: Ralph Miarka and Veronika Kotrba
If your team has a tendency to see obstacles outside of their team and influence and primarily wants others to change, you can try this activity:

Draw a big rectangle on the board and another rectangle inside of it, like a picture frame. Hang all complaints and grievances that surfaced in previous phases into the frame.

Now comes the interesting twist: Explain that if they want anything in the outside frame to change, they will have to do something themselves to affect that change. Ask the team to come up with actions they can do. Put these actions into the inner rectangle (near the outer sticky they are addressing).

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.