Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Emoticon Project Gauge (#32)

Help team members express their feelings about a project and address root causes early
Source: Andrew Ciccarelli
Prepare a flipchart with faces expressing various emotions such as:
  • shocked / surprised
  • nervous / stressed
  • unempowered / constrained
  • confused
  • happy
  • mad
  • overwhelmed
Let each team member choose how they feel about the project. This is a fun and effective way to surface problems early. You can address them in the subsequent phases.

Laundry Day (#98)

Which things are clear and feel good and which feel vague and implicit?
Source: Katrin Dreyer
Use this activity if you suspect the team to make lots of unconscious decisions hardly ever questioning anything. You can figure out what things need to be talked about to get an explicit grasp of them.

You need:
  • about 3 metres of string as the clothesline
  • about 20 clothes pins
  • a white shirt (cut from paper)
  • a pair of dirty pants (cut from paper)
Hang up the clothesline and mark the middle, e.g. with a ribbon. Hang up the clean shirt on one side and the dirty pants on the other. Ask the team now to write items onto index cards for each of the two categories: 'Clean - Clear and well understood' and 'Dirty - Unclear and confusing'. Hang up the notes with clothespins and re-arrange them into clusters. Now the team picks 2 'dirty' and 2 'clean' topics they want to talk about, e.g. by dot voting.

Remember the Future (#37)

Imagine the next iteration is perfect. What is it like? What did you do?
Source: Luke Hohmann
'Imagine you could time travel to the end of the next iteration (or release). You learn that it was the best, most productive iteration yet! How do your future selves describe it? What do you see and hear?' Give the team a little time to imagine this state and jot down some keywords to aid their memory. Then let everyone describe their vision of a perfect iteration.
Follow up with 'What changes did we implement that resulted in such a productive and satisfying future?'Write down the answers on index cards to use in the next phase.

Open Items List (#24)

Participants propose and sign up for actions
Source: Corinna Baldauf, inspired by this list
Prepare a flip chart with 3 columns titled 'What', 'Who', and 'Due'. Ask one participant after the other, what they want to do to advance the team. Write down the task, agree on a 'done by'-date and let them sign their name.
If someone suggests an action for the whole team, the proposer needs to get buy-in (and signatures) from the others.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.