Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Emoticon Project Gauge (#32)

Help team members express their feelings about a project and address root causes early
Source: Andrew Ciccarelli
Prepare a flipchart with faces expressing various emotions such as:
  • shocked / surprised
  • nervous / stressed
  • unempowered / constrained
  • confused
  • happy
  • mad
  • overwhelmed
Let each team member choose how they feel about the project. This is a fun and effective way to surface problems early. You can address them in the subsequent phases.

Value Stream Mapping (#79)

Draw a value stream map of your iteration process
Source: Paolo 'Nusco' Perrotta, inspired by Mary & Tom Poppendieck
Explain an example of Value Stream Mapping. (If you're unfamiliar with it, check out this video or this printable 1-pager.) Ask the team to draw a value stream map of their process from the point of view of a single user story. If necessary, ask them to break into small groups, and facilitate the process if they need it. Look at the finished map. Where are long delays, choke points and bottlenecks?

Speed Dating (#26)

Each team member explores one topic in depth in a series of 1:1 talks
Source: Thorsten Kalnin
Each participant writes down one topic they want to explore, i.e. something they'd like to change. Then form pairs and spread across the room. Each pair discusses both topics and ponders possible actions - 5 minutes per participant (topic) - one after the other. After 10 minutes the pairs break up to form new pairs. Continue until everyone has talked to everyone else.
If the group has an odd number of members, the facilitator is part of a pair but the partner gets all 10 minutes for their topic.

(The way to make all the pairings come out even is the following: Form two rows facing each other. This is pairing one. Pick one person. This person's position is fixed the entire time. Everybody else rotates one spot after each pairing.)

Three by Three (#125)

Build on each other's ideas to create a great action item
Source: Simon Tomes
This silent brainstorming technique helps the team come up with truly creative solutions and gives quiet people equal footing:

  • Everyone writes 3 sticky notes with 1 action idea each
  • Go around the room and pitch each idea in 15 seconds
  • Gather all stickies so that everyone can see them
  • Each team member adds their name to the sticky note that inspires them the most
  • Take off all ideas without a name on them
Repeat this process 2 more times. Afterwards, everyone can dot vote to determine which action(s) the team is going to implement.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.