Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Check In - Quick Question (#3)

Ask one question that each participant answers in turn
Source: Agile Retrospectives
In round-robin each participant answers the same question (unless they say 'I pass'). Sample questions:
  • In one word - What do you need from this retrospective?
    When someone answers something that alerts you such as "help" or "protection", you have to react to that e. g. with "Is there something we can do right now to help?" oder "What kind of protection?"
  • What's something that caused problems last iteration?
  • If you could change one thing about the last iteration what would it be?

Avoid evaluating comments such as 'Great'. 'Thanks' is okay.

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Learning Matrix (#9)

Team members brainstorm in 4 categories to quickly list issues
Source: Agile Retrospectives
After discussing the data from Phase 2 show a flip chart with 4 quadrants labeled ':)', ':(', 'Idea!', and 'Appreciation'. Hand out sticky notes.
  • The team members can add their input to any quadrant. One thought per sticky note.
  • Cluster the notes.
  • Hand out 6-10 dots for people to vote on the most important issues.
This list is your input for Phase 4.

Take a Stand - Line Dance (#48)

Get a sense of everyone's position and reach consensus
Source: Nick Oostvogels
When the team can't decide between two options, create a big scale (i.e. a long line) on the floor with masking tape. Mark one end as option A) and the other as option B). Team members position themselves on the scale according to their preference for either option. Now tweak the options until one option has a clear majority.

Feedback Door - Smilies (#23)

Gauge participants' satisfaction with the retro in minimum time using smilies
Source: Boeffi
Draw a ':)', ':|', and ':(' on a sheet of paper and tape it against the door. When ending the retrospective, ask your participants to mark their satisfaction with the session with an 'x' below the applicable smily.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.