Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Do you want to learn how to facilitate effective retrospectives? Check out our new series for beginners:

New: Corinna's Guide to Facilitating Retrospectives
Plan-ID:
Replaced by JS

Check In - Quick Question (#3)

Ask one question that each participant answers in turn
Source: Agile Retrospectives
In round-robin each participant answers the same question (unless they say 'I pass'). Sample questions:
  • In one word - What do you need from this retrospective?
    When someone answers something that alerts you such as "help" or "protection", you have to react to that e. g. with "Is there something we can do right now to help?" oder "What kind of protection?"
  • What's something that caused problems last iteration?
  • If you could change one thing about the last iteration what would it be?

Avoid evaluating comments such as 'Great'. 'Thanks' is okay.

Avoid Waste (#135)

Tackle the 7 Wastes of Software Development
Source: Tony O'Halloran
This activity facilitates a broad discussion around waste, using the 7 Wastes of Software Development from Lean Software Development by Mary and Tom Poppendieck.

Prepare the room with 7 flip-chart sheets, each representing a category of waste. Be sure to give enough room for small groups to stand around them, so spread the sheets out across the room!

The 7 categories of waste are:
  1. Partially Done Work
    Is work going from beginning to end in a single rapid flow? For example; are you building up large amounts of untested or undeployed work? Do you have long-lived feature branches?
  2. Extra Features
    Do your customers or users actually need what you’re building?
  3. Relearning
    Do you spend a lot of time rediscovering what you (or someone else on your team) already knew at one time?
  4. Handoffs
    Is your team truly collaborating, or handing off bits of work to each other, losing tacit knowledge in the process?
  5. Delays
    Does work typically spend lots of time stalled awaiting things like environments, someone to be available, or decisions to be made?
  6. Task Switching
    Do you find that you lose time to context switching frequently?
  7. Defects
    Does your team have a low defect rate? How late in the development process do you find defects? Could this feedback loop be shorter?
To start, briefly describe each of the different types of waste (more in-depth information here). Then pose the core questions:

In which situations do we incur this type of waste?
Where do we do a good job of avoiding this type of waste?

Break into groups of 2-3 people, preferably with a mix of roles in the groups. This helps to build awareness of the waste everyone else is dealing with on your team. Then, each group selects their first topic and spends a short amount of time writing post-its to answer the two questions above. Limit it to 2 or 3 minutes per topic and 2 post-its per person for each topic to avoid getting swamped with data. When the timebox is up, each group cycles to the next category until everyone has had an opportunity to contribute to each.

What themes are emerging? What do participants notice? Use dot-voting to decide which topics are important enough to further discuss in the next phase.

Mad Sad Glad (#7)

Collect events when team members felt mad, sad, or glad and find the sources
Source: Agile Retrospectives
Put up three posters labeled 'mad', 'sad', and 'glad' (or >:(, :(, :) alternatively). Team members write down one event per color coded card, when they've felt that way. When the time is up have everyone post their cards to the appropriate posters. Cluster the cards on each poster. Ask the group for cluster names.
Debrief by asking:
  • What's standing out? What's unexpected?
  • What was difficult about this task? What was fun?
  • What patterns do you see? What do they mean for you as a team?
  • Suggestions on how to continue?

Dot Voting - Start, Stop, Continue (#12)

Brainstorm what to start, stop & continue and pick the top initiatives
Source: Agile Retrospectives
Divide a flip chart into boxes headed with 'Start', 'Continue' and 'Stop'. Ask your participants to write concrete proposals for each category - 1 idea per index card. Let them write in silence for a few minutes. Let everyone read out their notes and post them to the appropriate category. Lead a short discussion on what the top 20% beneficial ideas are. Vote on it by distributing dots or X's with a marker, e.g. 1, 2, and 3 dots for each person to distribute. The top 2 or 3 become your action items.

(Check out Paulo Caroli's 'Open the Box' for an awesome variation of this activity.)

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains activities, allowing for combinations () and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Mastodon. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives trainings for scrum master certification and product owner certification. He also mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. Connect with him on LinkedIn, BlueSky, Mastodon, FB, Insta, Threads.