Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Temperature Reading (#22)

Participants mark their 'temperature' (mood) on a flipchart
Source: Unknown
Prepare a flipchart with a drawing of a thermometer from freezing to body temperature to hot. Each participant marks their mood on the sheet.

Timeline (#4)

Participants write down significant events and order them chronologically
Source: Agile Retrospectives
Divide into groups with 5 or less people each. Distribute cards and markers. Give participants 10min to note down memorable and / or personally significant events. It's about gathering many perspectives. Consensus would be detrimental. All participants post their cards and order them. It's okay to add cards on the fly. Analyze.
Color Coding can help to see patterns, e.g.:
  • Emotions
  • Events (technical, organization, people, ...)
  • Function (tester, developer, manager, ...)

Force Field Analysis (#115)

Analyse the factors that support and hinder a particular initiative
Source: Derek Neighbors, via Joel Edwards
State the topic that the team will explore in depth (deployment processes, peer-programming, Definition of Done, ...). Break the room into groups of 3-4 people each. Give them 5-7 minutes to list all contributing factors, drivers and actions that make up the topic. Go around the room. Each group reads 1 of their sticky notes and puts it up inside the force field until no group has any items left. Cluster or discard duplicates. Repeat the last 2 steps for factors that inhibit or restrain the topic from being successful or being as effective as it could be. Review all posted items. Add any that are missing.

To identify the most influential factors, everybody gets to 4 votes - 2 for contributing factors, 2 for inhibitors. Tally the votes and mark the top 2x2 factors with big arrows. Spend the last 15-20 mins of the session brainstorming ways to increase the top driving factors and decrease the top restraining factors.

Merge (#21)

Condense many possible actions down to just two the team will try
Source: Lydia Grawunder & Sebastian Nachtigall
Hand out index cards and markers. Tell everyone to write down the two actions they want to try next iteration - as concretely as possible (SMART). Then everyone pairs up with their neighbor and both together must merge their actions into a single list with two actions. The pairs form groups of 4. Then 8. Now collect every group's two action items and have a vote on the final two.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.