Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Temperature Reading (#22)

Participants mark their 'temperature' (mood) on a flipchart
Source: Unknown
Prepare a flipchart with a drawing of a thermometer from freezing to body temperature to hot. Each participant marks their mood on the sheet.

Delay Display (#127)

What's the current delay? And where are we going again?
Source: Christian Schafmeister
Draw a table with 3 columns. Head the first one 'Destination', the second one 'Delay' and the last one 'Announcement'.

Introduce the scenario: 'You are at a train station. Where is your train going? (It can be anything, a fictional or a real place.) How much of a delay does the train currently have? And what is the announcement? Why is there a delay? (This can be a real reason or modeled after the typical announcements.)'

Each team member fills out 3 sticky notes, 1 for each column. Going around the circle, each team member posts their notes and explains briefly, why they're going to destination X and why there's a delay (or not).

Trains and train delays are very familiar in Germany. Depending on your country and culture you might want to pick a different mode of transportation.

Mad Sad Glad (#7)

Collect events when team members felt mad, sad, or glad and find the sources
Source: Agile Retrospectives
Put up three posters labeled 'mad', 'sad', and 'glad' (or >:(, :(, :) alternatively). Team members write down one event per color coded card, when they've felt that way. When the time is up have everyone post their cards to the appropriate posters. Cluster the cards on each poster. Ask the group for cluster names.
Debrief by asking:
  • What's standing out? What's unexpected?
  • What was difficult about this task? What was fun?
  • What patterns do you see? What do they mean for you as a team?
  • Suggestions on how to continue?

Outside In (#124)

Turn blaming others into actions owned by the team
Source: Ralph Miarka and Veronika Kotrba
If your team has a tendency to see obstacles outside of their team and influence and primarily wants others to change, you can try this activity:

Draw a big rectangle on the board and another rectangle inside of it, like a picture frame. Hang all complaints and grievances that surfaced in previous phases into the frame.

Now comes the interesting twist: Explain that if they want anything in the outside frame to change, they will have to do something themselves to affect that change. Ask the team to come up with actions they can do. Put these actions into the inner rectangle (near the outer sticky they are addressing).

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.