Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Temperature Reading (#22)

Participants mark their 'temperature' (mood) on a flipchart
Source: Unknown
Prepare a flipchart with a drawing of a thermometer from freezing to body temperature to hot. Each participant marks their mood on the sheet.

The Good, the Bad and the Ugly (#121)

Collect what team members perceived as good, bad and non-optimal
Source: Manuel Küblböck
Put up three sections labeled ‘The Good’, ‘The Bad’ and ‘The Ugly’. Give everyone 5 minutes to note down one or more things per category from the last sprint. One aspect per post-it. When the time is up, have everyone stick their post-its to the appropriate labels. Cluster as you collect, if possible.

Brainstorming / Filtering (#10)

Generate lots of ideas and filter them against your criteria
Source: Agile Retrospectives
Lay out the rules of brainstorming, and the goal: To generate lots of new ideas which will be filtered after the brainstorming.
  • Let people write down their ideas for 5-10 minutes
  • Go around the table repeatedly always asking one idea each, until all ideas are on the flip chart
  • Now ask for filters (e.g. cost, time investment, uniqueness of concept, brand appropriateness, ...). Let the group choose 4.
  • Apply each filter and mark ideas that pass all 4.
  • Which ideas will the group carry forward? Does someone feel strongly about one of the ideas? Otherwise use majority vote.
The selected ideas enter Phase 4.

Outside In (#124)

Turn blaming others into actions owned by the team
Source: Ralph Miarka and Veronika Kotrba
If your team has a tendency to see obstacles outside of their team and influence and primarily wants others to change, you can try this activity:

Draw a big rectangle on the board and another rectangle inside of it, like a picture frame. Hang all complaints and grievances that surfaced in previous phases into the frame.

Now comes the interesting twist: Explain that if they want anything in the outside frame to change, they will have to do something themselves to affect that change. Ask the team to come up with actions they can do. Put these actions into the inner rectangle (near the outer sticky they are addressing).

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.