Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Weather Report (#2)

Participants mark their 'weather' (mood) on a flipchart
Source: Agile Retrospectives
Prepare a flipchart with a drawing of storm, rain, clouds and sunshine. Each participant marks their mood on the sheet.

Avoid Waste (#135)

Tackle the 7 Wastes of Software Development
Source: Tony O'Halloran
This activity facilitates a broad discussion around waste, using the 7 Wastes of Software Development from Lean Software Development by Mary and Tom Poppendieck.

Prepare the room with 7 flip-chart sheets, each representing a category of waste. Be sure to give enough room for small groups to stand around them, so spread the sheets out across the room!

The 7 categories of waste are:
  1. Partially Done Work
    Is work going from beginning to end in a single rapid flow? For example; are you building up large amounts of untested or undeployed work? Do you have long-lived feature branches?
  2. Extra Features
    Do your customers or users actually need what you’re building?
  3. Relearning
    Do you spend a lot of time rediscovering what you (or someone else on your team) already knew at one time?
  4. Handoffs
    Is your team truly collaborating, or handing off bits of work to each other, losing tacit knowledge in the process?
  5. Delays
    Does work typically spend lots of time stalled awaiting things like environments, someone to be available, or decisions to be made?
  6. Task Switching
    Do you find that you lose time to context switching frequently?
  7. Defects
    Does your team have a low defect rate? How late in the development process do you find defects? Could this feedback loop be shorter?
To start, briefly describe each of the different types of waste (more in-depth information here). Then pose the core questions:

In which situations do we incur this type of waste?
Where do we do a good job of avoiding this type of waste?

Break into groups of 2-3 people, preferably with a mix of roles in the groups. This helps to build awareness of the waste everyone else is dealing with on your team. Then, each group selects their first topic and spends a short amount of time writing post-its to answer the two questions above. Limit it to 2 or 3 minutes per topic and 2 post-its per person for each topic to avoid getting swamped with data. When the timebox is up, each group cycles to the next category until everyone has had an opportunity to contribute to each.

What themes are emerging? What do participants notice? Use dot-voting to decide which topics are important enough to further discuss in the next phase.

5 Whys (#8)

Drill down to the root cause of problems by repeatedly asking 'Why?'
Source: Agile Retrospectives
Divide the participants into small groups (<= 4 people) and give each group one of the top identified issues. Instructions for the group:
  • One person asks the others 'Why did that happen?' repeatedly to find the root cause or a chain of events
  • Record the root causes (often the answer to the 5th 'Why?')
Let the groups share their findings.

Dot Voting - Keep, Drop, Add (#38)

Brainstorm what behaviors to keep, drop & add and pick the top initiatives
Source: Agile Retrospectives
Divide a flip chart into boxes headed with 'Keep', 'Drop' and 'Add'. Ask your participants to write concrete proposals for each category - 1 idea per index card. Let them write in silence for a few minutes. Let everyone read out their notes and post them to the appropriate category. Lead a short discussion on what the top 20% beneficial ideas are. Vote on it by distributing dots or X's with a marker, e.g. 1, 2, and 3 dots for each person to distribute. The top 2 or 3 become your action items.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.