Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Check In - Amazon Review (#18)

Review the iteration on Amazon. Don't forget the star rating!
Source: Christian Heiß
Each team member writes a short review with:
  • Title
  • Content
  • Star rating (5 stars is the best)
Everyone reads out their review. Record the star ratings on a flip chart.
Can span whole retrospective by also asking what is recommended about the iteration and what not.

Analyze Stories (#5)

Walk through each story handled by the team and look for possible improvements
Source: Corinna Baldauf
Preparation: Collect all stories handled during the iteration and bring them along to the retrospective.
In a group (10 people max.) read out each story. For each one discuss whether it went well or not. If it went well, capture why. If not discuss what you could do differently in the future.

Variants: You can use this for support tickets, bugs or any combination of work done by the team.

Snow Mountain (#118)

Address problematic burndowns and scope creep
Source: Olivier Fortier
This activity is helpful when a team is constantly dealing with additional requests and scope creep. Use the burndown chart of problematic sprints to draw snowy mountains with the same outline. Add a few trees here and there. Print drawings of kids in various sledging situations such as kid sledging down fast, kid sledging and being scared, kid with a sledge looking bored, etc. (You can use Google image search with 'kid sledging drawing').

In teams of 2 or 3, ask the team members to identify which kid's reaction goes with which part of the mountain.
Example: If the mountain is flat, the kid might be bored. If you're facing a wall, the kid might be scared.

You can then discuss the team's reaction facing their own burndowns.

Dot Voting - Starfish (#49)

Collect what to start, stop, continue, do more and less of
Source: Pat Kua
Draw 5 spokes on a flip chart paper, dividing it into 5 segments. Label them 'Start', 'Stop', 'Continue', 'Do More' and 'Do less'. Participants write their proposals on sticky notes and put them in the appropriate segment. After clustering stickies that capture the same idea, dot vote on which suggestions to try.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.