Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Spot the Elephant (#130)

Are there problems nobody talks about?
Source: Willem Larsen
Prepare 1 set of cards per team member. A set of cards contains 1 elephant card, 1 boot card, 1 happy sun card, and 1 moon card. Explain how they each choose one card from their set:
  • If a team member thinks there is at least one 'Elephant in the room' (unspoken but important problem) for this team, then choose the Elephant card. Choosing this card doesn't mean that they have to talk about the Elephant or even say what they think the problem is.
  • If there are no Elephants, but they got their feelings hurt in an interaction at least once since the last retrospective (and didn't mention it), choose the Boot crushing flower card.
  • If everything is hunky dory for them, choose the Happy Sun.
  • If they're uncomfortable sharing, or don't feel like any other card fits, choose the neutral Moon.
To preserve anonymity, everyone places their chosen card face down on the feedback pile and the rest of their sets face down on a discard pile. Shuffle the discard pile to ensure anonymity and put it aside. Shuffle the feedback pile and then reveal the cards one at a time.

If your team has 1 or more Elephants in the room, you have some serious issues with psychological safety. Let the team sit with their new knowledge and offer a larger retrospective soon to make space for them to share if they wish, but do not ask directly who chose what. Preserve the anonymity and do not coerce explanations of the chosen card! This is a critical opportunity to build trust and preserve your ability to gain insight into the state of the team.

In the same way, depending on the size of your team, two or more hurt feelings suggest that you may have safety issues. Two or more Moons also suggests a lack of psychological safety. Take this feedback into consideration when designing your next retro. There are lots of great ways to more thoroughly dive into and surface learnings, this activity just points out when such a retrospective is needed.

Meeting Satisfaction Histogram (#87)

Create a histogram on how well ritual meetings went during the iteration
Source: Fanny Santos
Prepare a flip chart for each meeting that recurs every iteration, (e.g. the Scrum ceremonies) with a horizontal scale from 1 ('Did not meet expectations') to 5 ('Exceeds Expectations'). Each team member adds a sticky note based on their rating for each of these meetings. Let the team discuss why some meetings do not have a rating of 5.
You can discuss improvements as part of this activity or in a later activity such as Perfection Game (#20) or Plus & Delta (#40).

Poster Session (#91)

Split a large group into smaller ones that create posters
Source: Unknown, adapted by Corinna Baldauf, inspired by Michal Grzeskowiak
After you've identified an important topic in the previous phase you can now go into detail. Have the larger group split up into groups of 2-4 people that will each prepare a poster (flip chart) to present to the other groups. If you have identified more than one main topic, let the team members select on which they want to work further.
Give the teams guidelines about what the posters should cover / answer, such as:
  • What exactly happens? Why is that a problem?
  • Why / when / how does this situation happen?
  • Who benefits from the current situation? What is the benefit?
  • Possible solutions (with Pros and Cons)
  • Who could help change the situation?
  • ... whatever is appropriate in your setting ...
The groups have 15-20 minutes to discuss and create their posters. Afterwards gather and each group gets 2 minutes to present their results.

Outside In (#124)

Turn blaming others into actions owned by the team
Source: Ralph Miarka and Veronika Kotrba
If your team has a tendency to see obstacles outside of their team and influence and primarily wants others to change, you can try this activity:

Draw a big rectangle on the board and another rectangle inside of it, like a picture frame. Hang all complaints and grievances that surfaced in previous phases into the frame.

Now comes the interesting twist: Explain that if they want anything in the outside frame to change, they will have to do something themselves to affect that change. Ask the team to come up with actions they can do. Put these actions into the inner rectangle (near the outer sticky they are addressing).

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.