Spot the Elephant (#130)

Are there problems nobody talks about?
Source: Willem Larsen
Prepare 1 set of cards per team member. A set of cards contains 1 elephant card, 1 boot card, 1 happy sun card, and 1 moon card. Explain how they each choose one card from their set:
  • If a team member thinks there is at least one 'Elephant in the room' (unspoken but important problem) for this team, then choose the Elephant card. Choosing this card doesn't mean that they have to talk about the Elephant or even say what they think the problem is.
  • If there are no Elephants, but they got their feelings hurt in an interaction at least once since the last retrospective (and didn't mention it), choose the Boot crushing flower card.
  • If everything is hunky dory for them, choose the Happy Sun.
  • If they're uncomfortable sharing, or don't feel like any other card fits, choose the neutral Moon.
To preserve anonymity, everyone places their chosen card face down on the feedback pile and the rest of their sets face down on a discard pile. Shuffle the discard pile to ensure anonymity and put it aside. Shuffle the feedback pile and then reveal the cards one at a time.

If your team has 1 or more Elephants in the room, you have some serious issues with psychological safety. Let the team sit with their new knowledge and offer a larger retrospective soon to make space for them to share if they wish, but do not ask directly who chose what. Preserve the anonymity and do not coerce explanations of the chosen card! This is a critical opportunity to build trust and preserve your ability to gain insight into the state of the team.

In the same way, depending on the size of your team, two or more hurt feelings suggest that you may have safety issues. Two or more Moons also suggests a lack of psychological safety. Take this feedback into consideration when designing your next retro. There are lots of great ways to more thoroughly dive into and surface learnings, this activity just points out when such a retrospective is needed.

Mad Sad Glad (#7)

Collect events when team members felt mad, sad, or glad and find the sources
Source: Agile Retrospectives
Put up three posters labeled 'mad', 'sad', and 'glad' (or >:(, :(, :) alternatively). Team members write down one event per color coded card, when they've felt that way. When the time is up have everyone post their cards to the appropriate posters. Cluster the cards on each poster. Ask the group for cluster names.
Debrief by asking:
  • What's standing out? What's unexpected?
  • What was difficult about this task? What was fun?
  • What patterns do you see? What do they mean for you as a team?
  • Suggestions on how to continue?

If I were you (#95)

What could sub-groups improve when interacting with others?
Source: Thomas Wallet
Identify sub-groups within the participants that interacted during the iteration, e.g. developers/testers, clients/providers, PO/developers, etc. Give participants 3 minutes to silently write down what they think their group did that negatively impacted another group. One person should be part of one group only and write stickies for all groups they don't belong to - 1 sticky per issue.

Then in turn all participants read their stickies and give them to the corresponding group. The affected group rates it from 0 ('It was not a problem') to 5 ('It was a big problem'). Thus you get insights and shared understanding about problems and can select some of them to work on.

Open Items List (#24)

Participants propose and sign up for actions
Source: Corinna Baldauf, inspired by this list
Prepare a flip chart with 3 columns titled 'What', 'Who', and 'Due'. Ask one participant after the other, what they want to do to advance the team. Write down the task, agree on a 'done by'-date and let them sign their name.
If someone suggests an action for the whole team, the proposer needs to get buy-in (and signatures) from the others.

Debriefing Cube (#138)

Close with a reflective question from the Debriefing Cube and cards
Source: Chris Caswell and Julian Kea
A good debriefing deepens understanding, learning and sharing. Preparation: Download and assemble the Debriefing Cube and cards. During the retrospective, roll the cube. Then draw a card from the category it shows and use it to prompt a discussion. Repeat as time permits. This will broaden your debriefing options and is especially great for groups without a facilitator to enable them to effectively debrief on their own.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.