Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Spot the Elephant (#130)

Are there problems nobody talks about?
Source: Willem Larsen
Prepare 1 set of cards per team member. A set of cards contains 1 elephant card, 1 boot card, 1 happy sun card, and 1 moon card. Explain how they each choose one card from their set:
  • If a team member thinks there is at least one 'Elephant in the room' (unspoken but important problem) for this team, then choose the Elephant card. Choosing this card doesn't mean that they have to talk about the Elephant or even say what they think the problem is.
  • If there are no Elephants, but they got their feelings hurt in an interaction at least once since the last retrospective (and didn't mention it), choose the Boot crushing flower card.
  • If everything is hunky dory for them, choose the Happy Sun.
  • If they're uncomfortable sharing, or don't feel like any other card fits, choose the neutral Moon.
To preserve anonymity, everyone places their chosen card face down on the feedback pile and the rest of their sets face down on a discard pile. Shuffle the discard pile to ensure anonymity and put it aside. Shuffle the feedback pile and then reveal the cards one at a time.

If your team has 1 or more Elephants in the room, you have some serious issues with psychological safety. Let the team sit with their new knowledge and offer a larger retrospective soon to make space for them to share if they wish, but do not ask directly who chose what. Preserve the anonymity and do not coerce explanations of the chosen card! This is a critical opportunity to build trust and preserve your ability to gain insight into the state of the team.

In the same way, depending on the size of your team, two or more hurt feelings suggest that you may have safety issues. Two or more Moons also suggests a lack of psychological safety. Take this feedback into consideration when designing your next retro. There are lots of great ways to more thoroughly dive into and surface learnings, this activity just points out when such a retrospective is needed.

Expectations (#62)

What can others expect of you? What can you expect of them?
Source: Valerie Santillo
Give each team member a piece of paper. The lower half is blank. The top half is divided into two sections:
  • What my team mates can expect from me
  • What I expect from my team mates
Each person fills out the top half for themselves. When everyone is finished, they pass their paper to the left and start reviewing the sheet that was passed to them. In the lower half they write what they personally expect from that person, sign it and pass it on.
When the papers made it around the room, take some time to review and share observations.

If I were you (#95)

What could sub-groups improve when interacting with others?
Source: Thomas Wallet
Identify sub-groups within the participants that interacted during the iteration, e.g. developers/testers, clients/providers, PO/developers, etc. Give participants 3 minutes to silently write down what they think their group did that negatively impacted another group. One person should be part of one group only and write stickies for all groups they don't belong to - 1 sticky per issue.

Then in turn all participants read their stickies and give them to the corresponding group. The affected group rates it from 0 ('It was not a problem') to 5 ('It was a big problem'). Thus you get insights and shared understanding about problems and can select some of them to work on.

SMART Goals (#13)

Formulate a specific and measurable plan of action
Source: Agile Retrospectives
Introduce SMART goals (specific, measurable, attainable, relevant, timely) and examples for SMART vs not so smart goals, e.g.'We'll study stories before pulling them by talking about them with the product owner each Wednesday at 9am' vs. 'We'll get to know the stories before they are in our sprint backlog'.
Form groups around the issues the team wants to work on. Each group identifies 1-5 concrete steps to reach the goal. Let each group present their results. All participants should agree on the 'SMART-ness' of the goals. Refine and confirm.

Helped, Hindered, Hypothesis (#16)

Get concrete feedback on how you facilitated
Source: Agile Retrospectives
Prepare 3 flip chart papers titled 'Helped', 'Hindered', and 'Hypothesis' (suggestions for things to try out). Ask participants to help you grow and improve as a facilitator by writing you sticky notes and signing their initials so that you may ask questions later.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.