Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

String Theory (#129)

Surface shared traits and mutual interests among team members
Source: Eben Halford
This is an excellent activity for newly formed teams of 6 to 15 members. It speeds up team building by sharing traits and interests so that team members can build closer bonds than possible with just work-related stuff.

Have the team form a circle with everyone looking inwards. Leave about a foot of space between people. Depending on what you want to stress with this activity, you can ask colleagues that usually work remotely to stand about 5 feet away from the circle.

Hand a ball of yarn to a random player and tell them to hold on tight to the end of the yarn with their non-dominant hand and the ball in the dominant one. The yarn holder starts the game by saying something about themselves that is not work-related such as 'I have a daughter' or 'I play the guitar'. If this statement is true for any other team member they raise their hand and say 'Yes, that's me'. The yarn holder passes the ball to the person who raised their hand. If there's more than one, the yarn holder can choose one. If no one shares the statement the yarn holder has to make another statement.

The person who received the ball of yarn holds on to the thread and tautens it. This is the first connection in a network of shared traits. The new yarn holder now makes a statement about themselves, passes the ball while holding on to their part of the yarn and so on.

The game ends when time is up OR everybody has at least two connections OR the yarn runs out.

You can debrief with some of these questions:
  • What did you notice?
  • If you've got remote people: How does it feel to stand apart? How does it feel to have someone stand apart?
  • How do you feel about few (or no) connections?
  • What is it like to see this web of connections?
  • Can you be a team without this web?
  • What would happen if someone let go of their threads? How would it affect the team?
  • Is there anything you will do differently at work now?

This activity is only the first part of a longer game.

Sailboat / Speedboat (#19)

Analyze what forces push you forward and what pulls you back
Source: Luke Hohmann, found at Mike Griffiths
Draw a sailboat (or speedboat) onto a flip chart paper. Give it big sails (motor) as well as a heavy anchor. Team members silently write on sticky notes what propelled the team forward and what kept it in place. One idea per note. Post the stickies to sails (motor) and anchor respectively. Read out each one and discuss how you can increase wind (motor power) and cut anchors.

Variation: Some people add an iceberg in the back of the image. The iceberg represents obstacles they already see coming.

Brainwriting (#66)

Written brainstorming levels the playing field for introverts
Source: Prof. Bernd Rohrbach
Pose a central question, such as 'What actions should we take in the next iteration to improve?'. Hand out paper and pens. Everybody writes down their ideas. After 3 minutes everyone passes their paper to their neighbour and continues to write on the one they've gotten. As soon as they run out of ideas, they can read the ideas that are already on the paper and extend them. Rules: No negative comments and everyone writes their ideas down only once. (If several people write down the same idea, that's okay.)
Pass the papers every 3 minutes until everyone had every paper. Pass one last time. Now everyone reads their paper and picks the top 3 ideas. Collect all top 3's on a flip chart for the next phase.

Open Items List (#24)

Participants propose and sign up for actions
Source: Corinna Baldauf, inspired by this list
Prepare a flip chart with 3 columns titled 'What', 'Who', and 'Due'. Ask one participant after the other, what they want to do to advance the team. Write down the task, agree on a 'done by'-date and let them sign their name.
If someone suggests an action for the whole team, the proposer needs to get buy-in (and signatures) from the others.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.