Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Give me a face (#114)

Participants show how they feel by drawing a face on a tangerine
Source: Afagh Zadeh
Each team member gets a sharpie and a tangerine with a sticky note asking: 'How do you feel? Please give me a face'. After all are done drawing you go around and compare the works of art and emotions. It's a light-hearted way to set the stage.

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Speed Dating (#26)

Each team member explores one topic in depth in a series of 1:1 talks
Source: Thorsten Kalnin
Each participant writes down one topic they want to explore, i.e. something they'd like to change. Then form pairs and spread across the room. Each pair discusses both topics and ponders possible actions - 5 minutes per participant (topic) - one after the other. After 10 minutes the pairs break up to form new pairs. Continue until everyone has talked to everyone else.
If the group has an odd number of members, the facilitator is part of a pair but the partner gets all 10 minutes for their topic.

(The way to make all the pairings come out even is the following: Form two rows facing each other. This is pairing one. Pick one person. This person's position is fixed the entire time. Everybody else rotates one spot after each pairing.)

Systemic Consensus (#103)

Check for resistance instead of approval
Source: Georg Paulus, Siegfried Schrotta \& Erich Visotschnig via Corinna Baldauf
Do you have a hotly debated matter with several possible ways to go and the team can't agree on any of them? Instead of trying to find a majority for a way that will create winners and losers, try what happens if you turn the decision inside out:
Draw a table with the voters in the left-most column and proposals on top. Now everybody has to fill in their resistance towards each proposal. 0 means 'no resistance - this is what I want', up to 10, meaning 'shoot me now'. Give the least hated solution a try.

Feedback Door - Smilies (#23)

Gauge participants' satisfaction with the retro in minimum time using smilies
Source: Boeffi
Draw a ':)', ':|', and ':(' on a sheet of paper and tape it against the door. When ending the retrospective, ask your participants to mark their satisfaction with the session with an 'x' below the applicable smily.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.