Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Know your neighbour - Opening (#108)

How did your right neighbour feel during the iteration
Source: Fabián Lewkowicz
Ask each team member to briefly describe how their right neighbour felt during the iteration. Their neighbour confirms or corrects the guess.
Once all participants shared their best guess about how their teammates felt, you get an idea of how connected they are, how communication is flowing in your team and if people are aware of the feelings expressed, in some way, by others.

Consider closing with activity #109.

Analyze Stories (#5)

Walk through each story handled by the team and look for possible improvements
Source: Corinna Baldauf
Preparation: Collect all stories handled during the iteration and bring them along to the retrospective.
In a group (10 people max.) read out each story. For each one discuss whether it went well or not. If it went well, capture why. If not discuss what you could do differently in the future.

Variants: You can use this for support tickets, bugs or any combination of work done by the team.

Speed Dating (#26)

Each team member explores one topic in depth in a series of 1:1 talks
Source: Thorsten Kalnin
Each participant writes down one topic they want to explore, i.e. something they'd like to change. Then form pairs and spread across the room. Each pair discusses both topics and ponders possible actions - 5 minutes per participant (topic) - one after the other. After 10 minutes the pairs break up to form new pairs. Continue until everyone has talked to everyone else.
If the group has an odd number of members, the facilitator is part of a pair but the partner gets all 10 minutes for their topic.

(The way to make all the pairings come out even is the following: Form two rows facing each other. This is pairing one. Pick one person. This person's position is fixed the entire time. Everybody else rotates one spot after each pairing.)

Three by Three (#125)

Build on each other's ideas to create a great action item
Source: Simon Tomes
This silent brainstorming technique helps the team come up with truly creative solutions and gives quiet people equal footing:

  • Everyone writes 3 sticky notes with 1 action idea each
  • Go around the room and pitch each idea in 15 seconds
  • Gather all stickies so that everyone can see them
  • Each team member adds their name to the sticky note that inspires them the most
  • Take off all ideas without a name on them
Repeat this process 2 more times. Afterwards, everyone can dot vote to determine which action(s) the team is going to implement.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.