Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

Know your neighbour - Opening (#108)

How did your right neighbour feel during the iteration
Source: Fabián Lewkowicz
Ask each team member to briefly describe how their right neighbour felt during the iteration. Their neighbour confirms or corrects the guess.
Once all participants shared their best guess about how their teammates felt, you get an idea of how connected they are, how communication is flowing in your team and if people are aware of the feelings expressed, in some way, by others.

Consider closing with activity #109.

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Speed Dating (#26)

Each team member explores one topic in depth in a series of 1:1 talks
Source: Thorsten Kalnin
Each participant writes down one topic they want to explore, i.e. something they'd like to change. Then form pairs and spread across the room. Each pair discusses both topics and ponders possible actions - 5 minutes per participant (topic) - one after the other. After 10 minutes the pairs break up to form new pairs. Continue until everyone has talked to everyone else.
If the group has an odd number of members, the facilitator is part of a pair but the partner gets all 10 minutes for their topic.

(The way to make all the pairings come out even is the following: Form two rows facing each other. This is pairing one. Pick one person. This person's position is fixed the entire time. Everybody else rotates one spot after each pairing.)

Pitch (#73)

Ideas for actions compete for 2 available 'Will do'-slots
Source: Judith Andresen
[Caution: This game creates 'winners' and 'losers'. Don't use it if the team has power imbalances.]

Ask everyone to think of 2 changes they'd like to implement and write them down on separate index cards. Draw 2 slots on the board. The first team member puts their favorite change idea into the first slot. His neighbor puts their favorite into the second slot. The third member has to pitch her favorite idea against the one already hanging that she favors less. If the team prefers her idea, it's swapped against the hanging one. This continues until everyone has presented both their cards.

Try not to start the circle with dominant team members.

Feedback Door - Numbers (ROTI) (#14)

Gauge participants' satisfaction with the retro on a scale from 1 to 5 in minimum time
Source: ALE 2011, Corinna Baldauf
Put sticky notes on the door with the numbers 1 through 5 on them. 1 is the topmost and best, 5 the lowest and worst.When ending the retrospective, ask your participants to put a sticky to the number they feel reflects the session. The sticky can be empty or have a comment or suggestion on it.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.