Planning your next agile retrospective? Start with a random plan, change it to fit the team's situation, print it and share the URL. Or browse around for new ideas!

Is this your first retrospective? Start here!
Are you running your retrospectives with Miro? Create prettier boards faster with the giant Retromat Miroboard Mega Template!

Check out the Mega Template
Plan-ID:
Replaced by JS

ESVP (#1)

How do participants feel at the retro: Explorer, Shopper, Vacationer, or Prisoner?
Source: Agile Retrospectives
Prepare a flipchart with areas for E, S, V, and P. Explain the concept:
  • Explorer: Eager to dive in and research what did and didn't work and how to improve.
  • Shopper: Positive attitude. Happy if one good things comes out.
  • Vacationer: Reluctant to actively take part but the retro beats the regular work.
  • Prisoner: Only attend because they (feel they) must.
Take a poll (anonymously on slips of paper). Count out the answers and keep track on the flipchart for all to see. If trust is low, deliberately destroy the votes afterwards to ensure privacy. Ask what people make of the data. If there's a majority of Vacationers or Prisoners consider using the retro to discuss this finding.

Watermelon (#142)

How is your project really doing?
Source: Sabina Lammert
A disconnect between the actual state of a project and a too positive external view on it, can be dangerous. The longer the disconnect lasts and the wider the gap, the harder it becomes to address: Let’s look for gaps.

In this activity you compare internal and external view on progress and project state. Prepare a flipchart with a large watermelon cut through, red with seeds on the inside, yellow and green rings on the outside. Write “How does our project look internally?” inside the melon and “How does it appear on the outside?” outside of the green ring.

Prepare a second flip chart with some seeds above and caption them “Which bothersome seeds would we like to get rid of?”. Then draw a seedling captioned “What potential can we spot?” lower on the flipchart.

During the retro present the first flipchart and ask the questions. Let participants write their take on sticky notes – 1 comment per note. Then go around with each person reading out their note and posting in the appropriate spot. Have a short discussion on your observations.

Repeat this with the second flipchart and set of questions. In this round, allow more time for more in-depth discussion. If necessary, provide structure with Lean Coffee (#51).

Snow Mountain (#118)

Address problematic burndowns and scope creep
Source: Olivier Fortier
This activity is helpful when a team is constantly dealing with additional requests and scope creep. Use the burndown chart of problematic sprints to draw snowy mountains with the same outline. Add a few trees here and there. Print drawings of kids in various sledging situations such as kid sledging down fast, kid sledging and being scared, kid with a sledge looking bored, etc. (You can use Google image search with 'kid sledging drawing').

In teams of 2 or 3, ask the team members to identify which kid's reaction goes with which part of the mountain.
Example: If the mountain is flat, the kid might be bored. If you're facing a wall, the kid might be scared.

You can then discuss the team's reaction facing their own burndowns.

Open Items List (#24)

Participants propose and sign up for actions
Source: Corinna Baldauf, inspired by this list
Prepare a flip chart with 3 columns titled 'What', 'Who', and 'Due'. Ask one participant after the other, what they want to do to advance the team. Write down the task, agree on a 'done by'-date and let them sign their name.
If someone suggests an action for the whole team, the proposer needs to get buy-in (and signatures) from the others.

Elevenie (#144)

Write a short poem
Source: Stefanie Dinh
An Elevenie (German 'Elfchen') is a poem with 11 words on five lines – 1, 2, 3, 4 and 1 word per line respectively. Only do this with a team in which people enjoy working with each other. It's a wonderful activity to do with a team that is disbanding at the end of a project as a way to commerate the good times.

Hand out pens and paper and read out the instructions:
'We are going to each write a poem with 5 lines. Each line has a specific number of words. Don't worry, I'll guide you through each line, one by one. Write down 1 word that comes to mind when you think about our team (a feeling, a color, ...).
On the next line, describe this feeling with 2 words.
On the next line, add details with 3 words – What is it like? How does it smell or sound? What would you like to add?
On line 4, write down a sentence with 4 words, starting with 'I'. What do you associate with your feeling.
Take a moment to read your poem thus far. What 1 word comes to mind? This is the final word of your poem on line 5.'

Now you can go around and everybody who wants to, can read out their poem. Bring tissues, it can be quite moving.

(#)


Source:
Retromat contains 127 activities, allowing for 8349005 combinations (25x30x22x22x23+5) and we are constantly adding more.

Created by Corinna Baldauf

Corinna wished for something like Retromat during her Scrummaster years. Eventually she just built it herself in the hope that it would be useful to others, too. Any questions, suggestions or encouragement? You can email her or follow her on Twitter. If you like Retromat you might also like Corinna's blog and her summaries on Wall-Skills.com.

Co-developed by Timon Fiddike

Timon gives Scrum trainings. He mentors advanced scrum masters and advanced product owners. Human, dad, nerd, contact improv & tango dancer. He has used Retromat since 2013 and started to build new features in 2016. You can email him or follow him on Twitter. Photo © Ina Abraham.